Cases
undefined
19
2024
-
08
Guigang Tongji Bridge Project Steel Box Girder Installation and Jacking Construction Project
| Construction project | Guigang Tongji Bridge Project Steel Box Girder Installation and Jacking Construction Project |
|---|---|
| Project Location | Guigang City, Guangxi Province |
| Party Issuing Contract | China Gezhouba Group Machinery Ship Co., Ltd |
| Bridge Structure | The bridge is a self anchored suspension bridge with a span arrangement of 50m+140m+280m+140m+50m, and a total length of 660 meters. |
| Responsibilities Undertaken | Provide top pushing equipment and steel box girder top pushing technology services. |
| Quantity of Steel Structure (ton) | 11000t |
| Project Description | Tongji Bridge in Guigang City, Guangxi Province, as a part of Tongji Avenue, crosses the Yujiang River. The bridge is a self-anchored suspension bridge with a span of 50m+140m+280m+140m+50m and a total length of 660m; The beam body is located on a circular curve with a radius of 5000 m (road crown) and a 2.35% longitudinal slope. |



Latest Cases
Leave A Message
All products are selling well in both domestic and abroad.We also welcome OEM and ODM orders.
Contact Us
info@hndfyyl.com
+8615093660266
Luhuagang turntable 50 meters, Yuwangtai District, Kaifeng, Henan Province, China
Copyright © Kaifeng Dafang Prestressed Co, Ltd. All Rights Reserved. Powered by:www.300.cn SEO Privacy Policy
Copyright © Kaifeng Dafang Prestressed Co, Ltd. All Rights Reserved.
TOP
在线留言