Guigang Tongji Bridge Project Steel Box Girder Installation and Jacking Construction Project


Construction projectGuigang Tongji Bridge Project Steel Box Girder Installation and Jacking Construction Project
Project LocationGuigang City, Guangxi Province
Party Issuing ContractChina Gezhouba Group Machinery Ship Co., Ltd
Bridge StructureThe bridge is a self anchored suspension bridge with a span arrangement of 50m+140m+280m+140m+50m, and a total length of 660 meters.
Responsibilities UndertakenProvide top pushing equipment and steel box girder top pushing technology services.
Quantity of Steel Structure (ton)

11000t

Project Description

Tongji Bridge in Guigang City, Guangxi Province, as a part of Tongji Avenue, crosses the Yujiang River. 

The bridge is a self-anchored suspension bridge with a span of 50m+140m+280m+140m+50m and a total length of 660m; The beam body is located on a circular curve with a radius of 5000 m (road crown) and a 2.35% longitudinal slope.
The total length of the steel box girder of the main bridge is 518m. The top surface of the steel box is 39m wide, presenting a closed box section. Sidewalks are cantilevered on both sides. The bottom flat bottom plate is 30.9m wide, and the cantilevered arm plates on both sides are 5.2m wide. Height of beam at bridge centerline 3.5m. The horizontal spacing between the two slings on the steel beam is 36.5m, and the longitudinal spacing is 6.0m. The standard section length of the steel beam is 9.0m. The whole bridge is divided into 61 steel box sections, and the total weight is 11000t.
The construction method of girder first and then cable is adopted for the main girder. The pushing site is arranged on the south bank of Yujiang River, and the pushing construction is conducted from south to north. The north bank is closed first and then the south bank is closed. Based on the construction characteristics of self-anchored suspension bridge from erecting beam to pulling cable, the method of "multi point continuous pushing in the same direction by sections" is adopted for the installation of steel beam, with the maximum weight of 11000t.

 


Leave A Message

Kaifeng Dafang Prestressed Co, Ltd.

Contact Us

Contact   info@hndfyyl.com

  +8615093660266

Contact   Luhuagang turntable 50 meters, Yuwangtai District, Kaifeng, Henan Province, China


Copyright © Kaifeng Dafang Prestressed Co, Ltd.  All Rights Reserved.    Powered by:www.300.cn  SEO    Privacy Policy

Copyright © Kaifeng Dafang Prestressed Co, Ltd.  All Rights Reserved.

Powered by:www.300.cn  SEO   Privacy Policy

TOP

在线留言

提交留言